Risk Assessments
HAZAN, QRAs and PHAs
Risk assessments and Hazard Analysis (HAZAN) covers a range of techniques which are used to analyse hazards and risks. Typically, this includes analysing the consequences of hazards and the safeguards for hazard prevention and / or mitigation.
The process, facilitated by our consultants, draws on the knowledge and experience of the facility personnel to identify the hazards. These hazards are then ranked in order of importance and the significant risks are further analysed to determine whether further controls are required to be put in place.
Planager conducts quantitative (QRA), qualitative and semi-quantitative risk assessment.
Because of the repetitive nature of the calculations, computer programs are used. Planager runs a number of such computer models including the internationally recognised suite of programs from Dutch TNO (Effects and Riskcurves). A commonly required presentation of the results is as a series of individual risk contours showing the spread of risk within and surrounding the facility. Other presentations are available to meet regulatory and other requirements.
QRA is a powerful tool for helping the decision making process when looking at expenditure of scarce resources for reducing risk, choosing between processes, sites, modes of transport and storage, and looking at sensible separation distances.
Recent risk assessments completed by Planager include
QRA of LNG storage and load-out facilities
QRA of natural gas pipelines
QRA of three major upstream gas field developments including gas wells, gas treatment plants and pipelines
-
QRAs of chlorine storage and chemicals warehousing
QRA of ammonia storages
QRA of hydrogen plant
Risk assessment of several flammable gas pipelines to AS2885-requirements
Risk analysis and critical task assessment of a high-priority SCADA control room
Risk assessment for a Football League/Cricket Facility
Options assessment for LNG terminals
Risk assessment of the benefit of the use of safety barriers along a major highway
Risk assessment of major hazards associated with a major coal fired power station
Gap analysis in the risk assessment process used for a major power station upgrade project
Risk assessment of slide gate and turnstile for security equipment manufacturer
Risk assessment of communications system used for flammable liquids pipeline and terminals
Risk review for new pharmaceutical manufacturing building
Risk review of coal milling operation